Saturday, November 6, 2010

Phase 1 Complete. Phase Two begins

after about 4 hours work Ive successfully removed the 15 layers

http://imgur.com/iuo6B.png

Phase two is the detailing of the Temple itself, however during construction i encountered a potentially fatal Flaw, my plans had the proportions set out for a 40x14 hole when i had in fact dug a 40x15 hole throwing out the proportions of the designs

http://imgur.com/RDv1C.png

after a few minor alterations I was back on schedule albeit slightly displeased with the changes.

http://imgur.com/afOpW.png